AE86 - Blue Lightning

List of things done:


  1. Paint the whole car (2009).
  2. Reupholster the seats (2010)
  3. Change the front glass (2010)
  4. Buy 4 new tires 205 40/R17 (2010)
  5. Fuel Pressuere regulator (2011)
  6. Bi-xenon 6000k/8000k (2011)
  7. Fill the radiator with coolant (Prestone coolant 50/50) (2009)
  8. Always Full Synthetic Oil 20w-50 (Castrol) (2009~ )
  9. CF 3 gauge pillar mount (2010)



No comments:

Post a Comment